Provision of individual hot water supply using a solar system with vacuum solar collectors for a pool of 121 municipal educational institutions
3,21 mln € (121 objects)
Providing individual hot water supply using a solar power system with vacuum solar collectors. Installation of solar system equipment and rehabilitati...
-
Waste sorting and recycling complex
Upon request
Complex at landfill “Dalnytskyi careers” includes waste sorting and recycling line, garbage recycling line, landfill degassing complex and provides Eu...
-
Парогазова ТЕЦ на території міста
За запитом
Створення нових генеруючих потужностей сприятиме підвищенню енергетичної безпеки міста, забезпечить місто теплом та електроенергією. Будівництво ста...
-
Installation of solar power plants on the roofs of municipal educational institutions with a total capacity of 1 MW
1 151 000 EUR
Installation of solar power plants on the roofs of schools, kindergartens for electricity production and sales at a “green tariff”.
-
Comprehensive thermal modernization of buildings and ESCO (Energy Service Contract)
Upon request
Objects of a communal property needs the energy audit, installation of energy efficient and regulatory equipment.
-
Construction of a boiler room and cogeneration unit on alternative fuel on the basis of the “Salve” boiler house
6 mln EUR
Construction of a boiler room and cogeneration unit on alternative fuel (sunflower husk) on the basis of the boiler house “Salve"
-
Recultivation of the Luzanovsky Lakes
4 mln €
The project, within the reclamation (area of 81.24 hectares), proposes to preserve the situation of high-altitude and landscape planning structure of ...
-
Reconstruction of engineering networks and their integration with the city sewerage
13 mln UAH
Creation of a single city cable sewerage of low-current networks.
-
Pharmaceutical complex with an individual development center for the medical products
252 mln $
The complex will include the construction of factories for medical materials, bioadditives, veterinary drugs.
-
Street sunlight of new generation
Upon request
Intelligent self-inclusive solar lanterns designed for outdoor lighting in private and urban buildings, equipped with advanced LED and photovoltaic te...
-
Street lighting using LED technology
10,0–60,0 mln €
Providing quality street lighting according to European standards for reduction of budget expenditures for electricity bills.
-
Reconstruction of the sewage system in the territory of the Savitsky Park and the accumulating pond of the former Jute factory
650 000 €
The territory of Savitsky Park is 26.7 hectares. There is a pond in the park that needs to be renovated into proper sanitary and aesthetic condition.